Skip to content

Starting a business

How to Start a Custom Cabinetry Business

By The Launch Pad TeamPublished August 1, 202615 min read

Custom cabinetry is one of the few trades where one skilled person can quote $12,000 to $20,000 for a single kitchen and build it out of a two-car garage. Section 232 tariffs have put a 25 percent penalty on imported cabinet boxes and vanities through 2026, which is the best pricing tailwind a domestic shop has had in years. This guide covers startup costs, licensing, pricing per linear foot, equipment, your first customers, and a realistic 90-day plan.

How do you start a custom cabinetry business from zero?

Build one complete kitchen you can photograph, form an LLC, check your state license threshold, buy a used machine package, set up garage shop space, then price every quote from a real material list.

Nobody buys custom cabinetry from someone who cannot show them a finished box. Before you spend a dollar on marketing you need one complete run of cabinets you built yourself, photographed in good light, with the drawers pulled out and the joinery visible. Your own kitchen is the cheapest version of that, and it doubles as the sample you walk into a remodeler's office with.

The second thing you need is a pricing method, not a price. Custom cabinetry sells by the linear foot and the national range is wide, $500 to $1,200 per linear foot for the cabinetry on a full custom kitchen. Where you land inside that range is decided by your material list, your shop hours, and your loaded labor rate, so build the estimating spreadsheet before you quote anyone.

  • Build cabinets under someone else first if you can. A year in a production shop teaches face frame versus frameless, 32 mm system boring, and finish schedules faster than any course.
  • Register an LLC, get an EIN, and open a business bank account separate from your personal one.
  • Check your state license threshold before you quote, and start the application the same week, because processing is not instant. Thresholds run from effectively $0 in Nevada to $100,000 in Alabama, with California and Arizona both triggering at $1,000.
  • Bind general liability. A small cabinetry outfit typically pays $800 to $2,500 a year for a mid-risk trade policy.
  • Set up shop space with 220V single-phase power, dust collection, and a flat assembly table. The real constraint in a two-car garage is not machine count, it is flat assembly area and somewhere to spray without dust in the finish.
  • Buy the core machines used. A used professional table saw, jointer, and planer package runs $5,000 to $10,000 against new equipment that regularly exceeds $40,000.
  • Build a door display board: three door styles, two finishes, and one soft-close drawer on Blum TANDEM plus BLUMOTION slides that a customer can pull. It closes jobs that a photo cannot.
  • Price your first paid jobs from a real material list. Working custom shops report 39 to 42 percent of the job in material, so a $700 per linear foot kitchen carries roughly $273 to $294 per foot of material before you have paid yourself an hour.

How much does it cost to start a custom cabinetry business?

A lean solo shop starts at $16,000 to $28,000 with used machines and a trailer. Core machinery for a CNC shop budgets near $75,000, and a fully outfitted shop with a new van passes $130,000.

Equipment eats 30 to 50 percent of the initial budget, initial inventory another 15 to 20 percent, and shop lease and setup 10 to 15 percent. The often-quoted $2,000 to $10,000 startup floor for cabinet making is real, but only if you already own the machines and the truck and are not paying rent on the garage. Add the machines and a way to haul finished boxes and the honest lean number is $16,000 to $28,000.

The single decision that swings your number by $30,000 is new versus used. A used professional package of table saw, jointer, and planer lands at $5,000 to $10,000. The equivalent new machines regularly exceed $40,000. Buy the used package, book work, and let a signed kitchen pay for the $5,600 Blum MINIPRESS P Deluxe in year two instead of a credit line in year one.

Skip the van in year one. A 7 by 16 tandem-axle enclosed cargo trailer with a rear ramp costs about $6,880, roughly one seventh of a new 2026 Ford Transit at $50,795 MSRP or a Ram ProMaster at $48,965. If you already own a tow vehicle, that one choice frees about $42,000 of capital that belongs in machines and lumber. The trailer also locks, which a pickup bed does not, and finished painted doors do not ride in the rain.

ItemLean solo startFully equipped shop
Table saw, jointer, planer$5,000 to $10,000 used packageOver $40,000 new; a SawStop PCS 3HP alone is $3,881
Panel breakdown$799 to $899 Festool TS 60 K track saw$9,950 used ShopSabre 23 to $14,495 Laguna Swift CNC
Joinery$949 to $1,359 Festool Domino DF 500$4,899 to $5,399 Castle TSM-22 pocket cutter
Hinge boring and insertion35 mm Forstner and a shop jig, under $200$5,600 Blum MINIPRESS P Deluxe, 220V single phase
Shop space$0, home garage10 to 15 percent of the startup budget, leased
Initial material inventory$1,500 to $5,000 (15 to 20 percent of budget)$11,000 to $20,000 (15 to 20 percent of budget)
Vehicle$6,880 for a 7 by 16 enclosed cargo trailer$48,965 Ram ProMaster or $50,795 Ford Transit
License fees and bond premium$0 to $650 in fees, $75 to $250 premium$650 in fees, $250 premium on a $25,000 bond
Insurance, year one$800 to $2,500 general liability$2,500 GL plus about $3,388 workers comp
Realistic total$16,000 to $28,000$130,000 to $165,000

What licenses, certifications, and insurance do you need?

No national cabinetmaker license exists. Licensing states use a specialty class like California's C-6 Cabinet, Millwork and Finish Carpentry. Budget $200 to $650 in fees and $800 to $2,500 yearly for liability.

Cabinetmakers almost never pull a general contractor license. The classification you want is the specialty or limited one. In California that is C-6 Cabinet, Millwork and Finish Carpentry through the Contractors State License Board. In Arizona it is R-7 Carpentry, which covers finish carpentry, hardware, and millwork. In North Carolina cabinetry sits under Specialty Contractor. Seventeen states, including Colorado, Illinois, Indiana, New York, and Ohio, have no statewide general contractor license at all, though cities inside them often require registration anyway.

California is the useful worked example because its numbers are public. The application fee is $450, the initial license fee is $200 for a sole owner or $350 otherwise, a re-exam is $60, and Livescan fingerprinting runs about $75. That is $725 in state costs for a sole owner. Every California license also carries a $25,000 contractor bond, which costs roughly $250 a year in premium for a clean-credit applicant. So about $975 out of pocket in year one and $250 a year after that, against a licensing threshold of just $1,000 in job value. One vanity puts you over the line.

Bond amounts vary a lot outside California. Oregon CCB bonds run $15,000 to $25,000 for residential and $25,000 to $80,000 for commercial, with premiums starting near $75 a year. On insurance, the number that actually matters is your workers comp class code. Cabinet and trim work is code 5437, with rates as low as $2.50 per $100 of payroll, while residential framing at code 5645 reaches $43.42 per $100 in the priciest states. A misclassified application on a $50,000 payroll is the difference between about $1,250 and five figures. Get the code right in writing before the first payroll run.

Two standards are worth knowing by name. ANSI/KCMA A161.1 is the only performance standard for kitchen and vanity cabinets, administered by the Kitchen Cabinet Manufacturers Association, which has tested cabinets against it since 1965. Certification means meeting 14 construction requirements and passing eight categories of testing at accredited independent labs, so it is a scale decision, not something a one-person shop buys in week one. Build to the standard and say so honestly rather than implying you carry the seal. Separately, every composite panel you buy has to be labeled TSCA Title VI compliant. The rule at 40 CFR Part 770 covers hardwood plywood, MDF, and particleboard, and since March 22, 2019 a CARB Phase 2 label alone is not sufficient.

StateLicense triggers atWhat applies to cabinetry
California$1,000C-6 Cabinet, Millwork and Finish Carpentry, $25,000 bond
Arizona$1,000 labor plus materialsR-7 Carpentry, residential
Virginia$1,000Contractor license required once job value reaches $1,000
Maryland$500 residentialResidential work above $500 requires a license
NevadaEffectively $0Narrow exemption only for minor repairs under $1,000
North Carolina$40,000Specialty Contractor covers cabinetry and interior carpentry
Alabama$100,000Highest confirmed statewide threshold
FloridaNo state license for cabinet installationCabinet install is expressly exempt from GC licensure
TexasNo statewide licenseDallas, Austin, Houston and San Antonio require registration

How much should you charge for custom cabinetry?

Custom kitchen cabinets run $500 to $1,200 per linear foot, putting a 20 foot kitchen at $12,000 to $20,000 for cabinetry alone. Refacing runs $100 to $450 per linear foot.

Price by the linear foot and quote the whole run, not the box. A cabinet priced at $900 per linear foot carries only $300 to $500 of material and hardware. The rest is design, machining, finishing, and installation, which is exactly the part a homeowner cannot see and will negotiate against unless your proposal itemizes it. Ignore the consumer aggregator average of $7,427 for custom cabinets while you are at it. That figure blends single vanities and partial jobs with whole kitchens, and pricing a kitchen off it will bury you.

Worked example, and the point of it is that the low end of the range does not work. Dana quotes a 22 linear foot kitchen in painted maple with MDF center panels at $700 per linear foot, so the cabinetry contract is $15,400. Her material list comes to about $5,800: 20 sheets of three quarter inch cabinet-grade plywood at roughly $70 a sheet is $1,400, about 160 board feet of hard maple at $8 for face frames and door rails is $1,280, and 18 pairs of Blum TANDEM plus BLUMOTION undermount slides at about $38 a pair is $684, with MDF panels, hinges, drawer stock, edgebanding, primer and finish carrying the rest. She budgets 120 shop hours and 24 install hours. A cabinetmaker at $24 an hour costs about $31 loaded once payroll taxes and comp are in, so 144 hours is $4,464. Material plus labor is $10,264, leaving $5,136 of gross profit on $15,400, a 33 percent gross margin. That is below the healthy 40 to 55 percent band and it will not carry rent. Requote the identical job at $800 per linear foot and it bills $17,600, gross profit is $7,336, and the margin lands at 42 percent without one extra shop hour.

That is the whole lesson of the linear foot range. The $500 end is a production shop with a CNC and nested parts, not a solo maker cutting on a track saw. Mark up material 2.0x to 2.5x and then check the result against your target margin, because markup is not margin: a 25 percent markup produces only a 20 percent gross margin, and a 100 percent markup produces 50 percent. For true custom work a 2x to 3x markup on total cost puts you in the 50 to 67 percent gross range, which is where a shop carrying rent and a helper needs to live.

Keep refacing and closets on the price list even if you would rather build kitchens. Refacing at $100 to $450 per linear foot, $275 on average, turns a $4,000 to $13,000 job around in days instead of weeks. It uses no shop time on carcass work and it pays the rent in the months when nobody starts a full remodel.

JobTypical totalUnit pricing and notes
Full custom kitchen, about 20 linear feet$12,000 to $20,000$500 to $1,200 per linear foot, over $1,500 for complex layouts
Cabinet refacing, average kitchen$4,000 to $13,000$100 to $450 per linear foot, $275 average
Built-in bookcase wall$2,000 to $7,500$300 to $850 per linear foot installed
Built-in entertainment center$1,500 to $9,000Over $12,000 floor to ceiling with lighting and hidden outlets
Custom kitchen island$3,000 to $6,000Up to $10,000 with premium tops and special features
Custom bathroom vanity$1,000 to $4,000 installed$3,000 to $4,500 for a true custom cabinet alone
Walk-in closet system$3,000 to $8,000$100 to $350 per linear foot, real wood costs 2 to 3 times melamine
Reach-in closet$800 to $3,500Melamine and a day of install, the fastest winter filler
Shelf lighting or glass door add-ons$200 to $2,000Lighting $200 to $1,000, glass doors $400 to $2,000

How do you get your first custom cabinetry customers?

Your first jobs come from remodelers and kitchen designers, not homeowners. Carry a sample door, get onto three to five subcontractor lists, and photograph every install including the drawer boxes.

The fastest path is not homeowners, it is the people who already have them. General remodelers, kitchen designers, and interior designers hand cabinetry work to somebody every month, and the complaint they repeat about their current source is lead time, not price. Walk into five remodeling offices with a sample door, a business card, and a firm ship week you can actually hit. One steady remodeler can fill a solo shop's calendar by itself.

Worked example on the homeowner side, so you can see why it is the slower channel. You spend $300 printing and walking 1,500 door hangers across the four streets around a kitchen you just installed. Assume a conservative outcome of 6 calls, 3 in-home measures, and 1 signed job. An 18 linear foot kitchen at $800 per linear foot bills $14,400, and at the 42 percent gross margin from the pricing example that is about $6,048 of gross profit against $300 of spend. The catch is the lag: those 6 calls arrive over two months and one of them signs in the spring. The remodeler who already has a kitchen sold this month does not have that lag.

Homeowners shopping cabinetry are already inside a remodel, which tells you what to quote. Houzz puts median major kitchen remodels at $55,000 and minor projects at $20,000, and 76 percent of homeowners add built-in features during a kitchen renovation, with pantry cabinets leading at 47 percent. The built-in pantry, the island, and the closet system are already in the customer's head. Put them on every kitchen proposal as priced line items instead of waiting to be asked.

  • Get on 3 to 5 general contractor subcontractor lists and give each one a written lead time in weeks, not a vague promise.
  • Build a door display: three styles, two finishes, one soft-close drawer on Blum TANDEM slides that a customer can pull.
  • Photograph every install properly, including drawer boxes, the inside of a blind corner, and a scribe against an out-of-square wall. Custom buyers look at joinery.
  • Put the portfolio where kitchens actually get shopped and where designers already are: Houzz and your local NKBA chapter, not a generic directory listing.
  • Ask a designer for the specification relationship, not the job. A designer who specifies your shop by name brings every project they sell.
  • Quote within 48 hours of the measure with a shop drawing attached. In this trade a fast, dimensioned proposal beats a cheaper one that arrives in two weeks.
  • Put a yard sign out for the two weeks of every install and door-hang the surrounding streets while your trailer is already parked there.

What tools, equipment, and software does a cabinet shop need?

Start with a table saw, a track saw, a Domino or pocket-hole joinery machine, clamps, dust collection, and a spray setup. That core kit runs roughly $6,000 to $12,000.

Buy in the order that money flows. Table saw and track saw first, because you cannot break down a sheet without them. Joinery machine second, because that is where your hours go. Add a Castle TSM-22 pocket cutter at $4,899 to $5,399 or a Blum MINIPRESS P Deluxe at $5,600 and the kit passes $20,000 fast, which is exactly why both are year-two purchases.

Do the payback math before you buy the MINIPRESS. It bores 35 mm hinge cups and presses mounting plates in one motion, saving roughly six hours of drilling and fitting per kitchen. At a $31 loaded shop hour that is about $186 saved per kitchen, so a $5,600 machine pays itself back over roughly 30 kitchens. At eight kitchens a year that is nearly four years, which is fine once your volume is real and absurd when you have two jobs booked.

The CNC router is a scale decision, not a startup decision. A Laguna Swift Series starts at $14,495 and a used ShopSabre 23 shows up around $9,950. What they buy you is nesting a whole kitchen's parts in a day with dados, shelf pin holes, and hinge cups bored in the same setup. Neither makes a dollar in a shop with two jobs booked. A track saw, a disciplined cutlist, and a shelf pin jig do the same work slower for under $1,000.

Two things people leave out of the budget and then regret. Dust collection is not optional the moment you cut MDF, and a shop vac will not keep up with a planer. And you need a place to spray with heat and air movement, because finishing is where custom cabinetry gets judged. One purchasing note that trips people up: Festool is dealer-only in the United States, so you will not find a TS 60 K or a Domino at Home Depot, Lowe's, or Amazon. Find your dealer before you plan a build week around a tool you have not bought yet.

ItemExample model or typeCost
Cabinet table sawSawStop PCS31230-TGP236, 3HP, 36 inch T-Glide$3,881
Starter sawSawStop Contractor Saw, 1.75HP, 36 inch T-Glide$2,329
Track sawFestool TS 60 K, with 55 inch FS 1400 guide rail$799 to $899
Loose tenon joineryFestool Domino DF 500 Q Set with Systainer3$949 to $1,359
Cordless joineryFestool DOMINO DFC 500, released June 2026$1,279
Pocket cutterCastle TSM-22 pocket cutter machine$4,899 to $5,399
Hinge boring and insertionBlum MINIPRESS P Deluxe, 220V single phase$5,600
CNC routerLaguna Swift Series 4 by 8, or used ShopSabre 23$9,950 used to $14,495 new
EdgebanderPortable entry unit up to a production machine$5,000 to $20,000
Design and nesting softwareMonthly seat at the low end, full license at the highUp to $10,000
Enclosed trailer7 by 16 tandem-axle with rear ramp$6,880
Drawer slides, per drawerBlum TANDEM plus BLUMOTION 563H undermount$29.83 to $49.79 per pair

What should the first 90 days look like?

Weeks 1 and 2 are legal setup and shop build-out. Weeks 3 to 6 build a sample run and land two deposits. Weeks 7 to 12 build a four week backlog.

PhaseWhat to doMilestone that proves it
Weeks 1 to 2Form the LLC, bind $800 to $2,500 general liability, file the license application in your state the same week, buy the used machine package, wire 220V and dust collection, build the estimating spreadsheetA working shop and a spreadsheet that prices a 20 linear foot kitchen in under an hour from a material list
Weeks 3 to 6Build your own kitchen or a full sample run, make the three-door display board, visit five remodelers and three kitchen designers, quote every lead within 48 hours with a shop drawingTwo signed jobs with deposits that cover material before you buy it, and a photo set of finished cabinetry
Weeks 7 to 12Hit the promised ship week, add closets and vanities as filler between kitchens, move your quoted price up toward $800 per linear foot, order material a job aheadA four week backlog, one repeat remodeler, and 40 percent or better gross margin on every job you close

What mistakes kill new custom cabinetry businesses?

Pricing by gut instead of by linear foot, deposits too small to cover material, painted solid wood center panels, spraying finish in a cold garage, and running one giant job at a time.

  • Building painted five-piece doors with solid wood center panels. When an ultra-dry house drives door moisture content below 6 percent, corner cracks appear on virtually all of them. Use MDF center panels on anything painted, and write witness lines at stile and rail junctions into the contract as an expected characteristic before the job starts, not after the customer sees the line.
  • Spraying in an unheated garage in January. Waterborne and conversion finishes want roughly 65 to 75 degrees and moderate humidity. Below that you get blushing, poor flow, and a cure that never fully hardens, and you will strip and respray a whole kitchen on your own dime.
  • Taking a 10 percent deposit when material is 39 to 42 percent of the job. You are financing your customer's kitchen with your own line of credit. Structure the deposit so material is paid for before you buy it.
  • Quoting a lump sum with no linear foot basis. At $500 to $1,200 per linear foot, a measure that is two feet short costs you $1,000 to $2,400 on one kitchen and you will still build those two feet.
  • Measuring once, before demo. Take the budget measure with the old kitchen in place, then take the field measure after demo and before the shop cuts a single part. Drywall, out-of-square corners, and a relocated soffit all move your numbers.
  • Buying panels that are not labeled TSCA Title VI compliant. Since March 22, 2019 a CARB Phase 2 label by itself is not sufficient for hardwood plywood, MDF, or particleboard.
  • Getting the workers comp class code wrong. Cabinet and trim work is code 5437 at rates as low as $2.50 per $100 of payroll. Residential framing at code 5645 reaches $43.42 per $100.
  • Buying the CNC before the backlog. A $14,495 router does not create demand, and the payment lands in January whether or not you have work booked.
  • Working from the customer's napkin sketch instead of your own shop drawings. Every change order you cannot point to in writing comes out of your margin.
  • Running one giant kitchen at a time. The shop goes dark between deposits. Keep a closet or a vanity in the queue so machine time and cash flow overlap.

Is a custom cabinetry business worth it and what can you make?

A solo maker shipping eight kitchens plus filler work grosses around $140,000, keeping roughly $63,000 gross profit. Healthy shops run 40 to 55 percent gross margin and 10 to 20 percent net.

Run the numbers from the bench, not from a spreadsheet fantasy. A solo maker who delivers one full kitchen roughly every six weeks does about eight a year. At $14,000 each that is $112,000, plus perhaps $30,000 of closets, vanities, and refacing in the gaps, so call it $140,000 gross. At a 45 percent gross margin that is $63,000 before rent, insurance, the trailer payment, and self-employment tax. That is a real living and it is not yet a business. Year one will land below it, because roughly the first 90 days produce a sample kitchen instead of an invoice.

The step change comes with the first employee. A cabinetmaker runs $21 to $24 an hour, which is $44,000 to $50,000 in wages before payroll taxes and comp push the loaded cost past $55,000. At class code 5437 that comp is comparatively cheap, which is the one structural advantage this trade has over framing. Two people ship roughly fourteen kitchens plus filler rather than eight, which is what puts a two-person shop near $250,000 while an owner-only shop stalls no matter how many hours the owner works.

Be honest about the net. The wholesale pricing model puts material at 25 to 35 percent and labor at 20 to 30 percent, though working custom shops report material closer to 39 to 42 percent, which is the gap between a model and a bench. A well-run shop clears 10 to 20 percent net after everything, and the AWI Cost of Doing Business survey typically puts profit for highly profitable shops around 12 percent of gross sales. Anyone promising you 40 percent net in cabinetry is selling you something.

The macro picture is mixed and you should know it. BLS counted about 214,600 woodworking jobs in 2024 with a median annual wage of $43,720, and projects employment to decline 2 percent through 2034. That decline is concentrated in production woodworking rather than local custom shops, but it does mean your growth has to come from taking share off imported boxes rather than riding a growing market.

When is the busy season for custom cabinetry?

Demand peaks April through August at 15 to 30 percent premium pricing. November through February is the trough, January and February slowest. Closets, vanities, and refacing fill winter.

Plan the trough on purpose instead of being surprised by it. Contractor rates run 10 to 20 percent lower November through February, and discounting labor 5 to 15 percent in January and February is accepted industry practice, not a sign of a weak shop. What you want is enough interior-only, short-duration work booked in October to keep the machines running: closets, vanities, and refacing are unaffected by weather and do not depend on a whole household living through a demo.

There is a useful counter-pattern. A meaningful segment of homeowners deliberately starts kitchen remodels at the beginning of the year specifically to lock in skilled trades before everyone is overbooked. Market to that person in November and December with one message: book now, take my January build slot, and your kitchen is finished before spring. One caveat for your own shop, though, is that January is also when a dry heated house cracks paint at door joints and produces callbacks on last year's work, so leave bench time for them.

MonthsDemand and pricingWhat to sell
April to AugustPeak, 15 to 30 percent premium pricingFull kitchens, islands, large built-ins
September and OctoberStrong and deadline-drivenKitchens that must finish before the holidays, plus booking January slots
November and DecemberSlowing, rates 10 to 20 percent lowerCloset systems, bathroom vanities, entertainment centers
January and FebruarySlowest months of the yearRefacing, reach-in closets, shop drawings, paint-crack callbacks
MarchRecovering into peakDeposits collected for spring kitchen builds

How do you compete with big-box and franchise cabinet sellers?

Compete on fit, species, and lead time, not price. Section 232 tariffs put 25 percent on imported cabinets and vanities through 2026, which narrows the gap between your shop and stocked box brands.

The tariff picture is the best news a domestic shop has had in years. Section 232 tariffs on wooden kitchen cabinets and vanities took effect October 14, 2025 at 25 percent, covering both finished cabinets and component parts. The scheduled jump to 50 percent on January 1, 2026 was pushed a full year to January 1, 2027, so 25 percent is the rate through 2026. Every imported box your competitor quotes carries that penalty. Yours does not. Say the number out loud in the sales conversation.

Franchising is the other competitor, and the entry cost tells you what you are up against. A Kitchen Tune-Up franchise runs $121,930 to $198,850 all in, including a $79,950 initial franchise fee, before royalties. A lean independent shop at $16,000 to $28,000 gets into the same market for roughly a fifth of the low end of that range and keeps every point of margin. What the franchise buys is a system and a name, not customers.

Your actual weapons are the ones a warehouse cannot copy. You can build to a wall that is three quarters of an inch out of plumb over eight feet, match an existing species and stain on an addition, put a 42 inch upper where the catalog stops at 36, and build to the ANSI/KCMA A161.1 construction requirements with the joinery visible in the photos. Sell the site measure and the shop drawing early in the conversation, because that is the moment a homeowner understands why custom costs what it costs.

Frequently asked questions

How much does it cost to start a custom cabinetry business?

A lean solo shop starts at about $16,000 to $28,000, covering a used table saw, jointer and planer package, a track saw, a joinery machine, initial material, general liability, and a $6,880 enclosed trailer instead of a van. A fully outfitted shop with a CNC router and a new cargo van runs $130,000 or more.

How much do custom cabinet makers charge per linear foot?

Full custom kitchen cabinets run $500 to $1,200 per linear foot, with complex layouts and high-end materials pushing past $1,500. The $500 end is a CNC production shop, not a solo maker. Refacing runs $100 to $450 per linear foot and closet systems $100 to $350.

Do you need a license to build and install custom cabinets?

It depends on your state. There is no national cabinetmaker license, and licensing states use a specialty classification such as California's C-6 Cabinet, Millwork and Finish Carpentry. Thresholds range from effectively $0 in Nevada and $1,000 in California and Arizona up to $100,000 in Alabama, while Florida exempts cabinet installation from GC licensure entirely.

Why do painted cabinet doors crack at the corners?

Wood moves far more across the grain than with it, and when an ultra-dry heated house drives door moisture content below 6 percent, hairline cracks show at the stile and rail joints. They do not weaken the joint, but they are very visible on paint and paint-glaze finishes. Building painted doors with MDF center panels is the standard fix.

What can a one-person cabinet shop realistically make in year one?

A steady solo shop grosses around $140,000, which is roughly eight full kitchens at $14,000 plus about $30,000 of closets, vanities, and refacing. Year one lands below that because the first 90 days produce a sample kitchen instead of invoices. At a 45 percent gross margin that is about $63,000 before rent, insurance, and taxes.

Related guides

Part of our hubs on starting a business and AI for small business.

47 guides available.